I just met with my construction manager at the site. He was kind enough to measure the misplaced pipes again so I have something official. Let’s put it this way: About 70% are wrong. Actually good for our floor slab builder, because he can still correct before the concrete is poured. Originally I wanted to discuss this alone with him. But since he told me that “he never makes mistakes”, I got some help. I will now get an official letter and then we’ll see. Maybe it will go a little better then? I’m just afraid that then somehow bungled, ie pipes are stupidly re-set, no new foil and the old remains with holes, etc.. My trust in the construction industry is gone anyway and is shaken every day anew.

At least I seem to have a strong partner on my side in the construction manager. Really my last and only ray of hope in all this mess. ๐Ÿก